Oncor Village Creek Tap in Arlington, Texas
KCE Engineering was part of a design-build team that included KEC Retaining Walls and Construction, Inc. (construction), Falkofske Engineering (structural wall design), Spooner and Associates, Inc. (survey), and Arias Geotechnical for the Oncor Village Creek Tap in Arlington, Texas.
KCE Engineering was responsible for the retaining wall locations, top and bottom of wall elevations as well as the flood study for the 2D HEC-RAS model to show no adverse impacts to other properties as a result of the wall construction. The space for the walls was limited by the railroad along the northern part of the easement which constricted the wall location and construction access.
For more information about KCE Engineering or our engineering services in the DFW Metroplex, contact us today.